Erosion Protection Systems; filter matt, flexible block, uniform matt
Australian Owned, Operated,
Made & Exported


International Erosion Control Association
Member of the International Erosion Control Association

Erosion Protection Systems Pty Ltd

EPS is a recognised supplier and installer of grout filled revetment mattress productsErosion Protection Systems (EPS) is an internationally recognised company specialising in the supply and installation of grout filled revetment mattress products for erosion control and flood repair works. With 30 years of experience in this field, we offer a history of knowledge and engineering expertise unmatched by our competitors, both in Australia and overseas. The products provide a cost effective alternative to the  traditional methods that include stone pitching, sand bags, gabions, rock mattresses, reinforced concrete and rip rap protection.

In comparison to the above methods of flood protection, the fabric formed mattress products offer significant cost savings and are readily installed under water. The unparalleled speed of installation allows for the fast tracking of large-scale projects, thus providing additional costs savings for project managers and clients alike. The products can also be coloured to blend in with their natural environment.

The revetment mattress is a double-layered fabric that acts as a formwork to allow the injection of a high strength grout between the layers. The resulting finished product acts as a barrier to prevent erosion that may otherwise occur on a number of engineering structures, including:

  • EPS is a recognised supplier and installer of grout filled revetment mattress productsWharf and Harbour embankments
  • Bridge abutments and road shoulder protection
  • Culverts and spillways
  • Seawalls and river linings
  • Embankment and lake linings
  • Sludge lagoons and aeration ponds
  • Boat ramps and hovercraft pads

 


PLEASE CLICK HERE FOR THE LATEST NEWS

Recent Project: Major channel Project Gladstone

gladstone

EPS were contracted to protect the base and sides of a 1.5 km long channel suurounding a chemicial plant near Gladstone. The installation involved nearly 13,000 square metres of 125 mm Filter mattress and was completed within the 7 week alloted time schedule. This equates to more than 300 square metres per day with only a 3 man crew to undertake the works. Apart from the economic savings, the speed of installation of this product is unmatched by any of the alternative products.